- Route
-
Cranfield Footpath No. 21
- Reason for closure
-
This closure is required due to rotten footbridges at points A (OS GR SP 9582 4376) and B (OS GR SP 9591 4363). The closure is expected to be in place until the full condition of these bridges can be assessed.
- Closure ends
-
The emergency closure ends on 11 June 2026 but may be extended. The closure is expected to be in place until the full condition of these bridges can be assessed.
- Closure documents