- Route
-
Stondon Footpath No. 48
- Reason for closure
-
Temporary closure is required as the bridge deck is unsafe and the bridge needs replacing.
- Closure ends
-
11 June 2026
- Closure documents
Stondon Footpath No. 48
Temporary closure is required as the bridge deck is unsafe and the bridge needs replacing.
11 June 2026