- Route
-
Harlington Footpath Nos. 36, 23 and 4
- Reason for closure
-
Temporary closure is required to enable installation of the remaining site drainage and to construct the new (FP36) and upgraded (FP23) footpaths.
- Closure ends
-
26 September 2026
- Closure documents