John Donne Lower School consultation

Proposal to enlarge the premises of John Donne Church of England Voluntary Aided Lower School

Consultation closed

Consultation closed: midday on Thursday, 16 March

Download the statutory notice (PDF 63KB)

Description of proposed alteration

The governing body of John Donne C of E VA Lower School proposes to enlarge the premises of the school in order to provide additional accommodation, following the schools determination to change from a lower to a primary school.

The governing body intends to build one new classroom plus additional toilets to help accommodate year 6 children from September 2018. For this prescribed enlargement of the school premises, the Department for Education (DfE) requires us to carry out a statutory consultation.

The proposed enlargement is subject to planning permission and to any permission required from the DfE for the ‘change of use for playing field land’.

Evidence of demand for proposed alteration versus need, including results of preliminary consultation

The governing body of John Donne C of E VA Lower School, carried out a non statutory consultation regarding their proposed change of age range from lower to primary, ie from age 3 (nursery) to age 9 (year 4) to age 3 (nursery) to age 11 (year 6). For a proposed change of age range for a voluntary aided school, the school does not require the permission of the local authority, nor is the local authority required to undertake a consultation for the proposed change.

The governing body is able to propose, consult and then determine the proposal, with the local authority acting only in the capacity of a consultee.

The governing body’s consultation ran from 12 October to 23 November 2016. Consultees invited to provide feedback included school governors, staff, and parents/carers, the local parish council, other schools and academies within Central Bedfordshire and Central Bedfordshire Ward Members.

Responses to the consultation confirmed that 90% of respondents strongly agreed with the proposal.

After careful consideration of the issues raised during the consultation, both in writing and also verbally at the stakeholder meetings, the governing body of John Donne C of E VA Lower School unanimously agreed to proceed with an age range change, to become a single phase primary age 3 to 11 year old provision for 2017-18, with the first phase being the extension of the upper age range by one year to take Year 5 in September 2017 followed by Year 6 in September 2018.

Objectives - including how the proposal would increase educational standards and parental choice

Within their consultation document for their proposed change of age range from lower to primary school the governing body summarised what they believed to be the benefits of their proposal:

  • to provide better continuity of the curriculum – where each phase of education (infant, junior and secondary) teaches distinct, complete key stages
  • to engage in greater collaborative working between schools, enhancing the sharing of specialist provision, with the intention of improving student attainment and progress across all phases
  • to sustain high standards of education and maintain the nurture and well-being of children by offering them only the minimum change of schools, thereby ensuring sustained progress in all areas
  • to ensure that all of the schools involved in the proposal work positively as partners to ensure a high quality and localised educational provision, with full agreement of each school’s governing body
  • to ensure that all of the schools involved in the proposal offer children and young people a broad, balanced and cohesive, exciting and innovative curriculum that meets their needs and supports them in achieving their full potential
  • to allow us to track and monitor pupil progress and attainment throughout Key Stage 1 and 2 within the same school, building improved accountability for pupil progress within both Key Stages and bringing the school in line with the prevailing system of education across the majority of the UK
  • to offer children a further 2 years within a primary model of teaching and learning before moving to a secondary model – meaning fewer daily changes of teacher and environment. This will give pupils time to mature and become ‘secondary ready’ in line with the National Curriculum expectation at the end of Year 6
  • to work together to continue to drive up standards at the end of Key Stage 2

In order to help accommodate the additional year 6 class from September 2018, and thereby help provide the benefits listed, the governing body intend to build a new classroom plus additional toilets.

The effect on other schools, academies and education institutions in the area

Consultations were also carried out during October/ November 2016 regarding a proposed change from lower to primary for the following schools:

  • Everton Lower School
  • St Swithuns VC Lower School
  • Moggerhanger Lower School
  • Robert Peel Lower School

Sandy Upper School also consulted on a proposal to change from 13-18 years to 11-19 years, in order to create a full secondary provision.

And 3 further schools consulted on a proposal to join together to become a multi academy trust: Laburnum Lower School, Maple Tree Lower School and Sandye Place Academy (middle).

Following the closure of the consultations and consideration of the responses received:

  • the governing bodies of Robert Peel Lower and St Swithun's VC Lower Schools determined to change from lower to primary from September 2017
  • the governing body of Moggerhanger Lower determined to change from lower to primary from September 2018
  • the governing body of Sandy Upper school determined to change from upper to secondary from September 2018
  • the governing bodies of Laburnum Lower School, Maple Tree Lower School and Sandye Place Academy determined to place their proposal on hold and to take all of the comments received during the consultation on board to inform their next step
  • on 21 March 2017 we will determine a change of age range for Everton Lower School, from September 2017

Of the lower schools that have determined to change their age range, Robert Peel Lower and St. Swithun's VC Lower are also required to provide new additional accommodation for year 6 in September 2018. Statutory consultations are therefore also being carried out by Central Bedfordshire Council for the prescribed enlargement of Robert Peel Lower and St. Swithun's VC Lower, as required by the DfE.

Now that the proposed age range changes have been determined, the proposed expansion of the schools will have minimal effect on other schools, academies and educational institutions within the area.

Project costs and indication of how these will be met

The day to day running costs of school provision are met through revenue funding which is made available to each school as part of the Dedicated Schools Grant (DSG) and is based primarily on the numbers of pupils attending each school. This increases accordingly within an expanded school and would fund the additional teacher and resources that would be required for the additional children within the expanded school buildings. Funding required for the additional classroom and toilets will need to be sourced/ provided by the governing body.

Related proposals

As detailed above, other schools within the Sandy area have consulted on and subsequently determined to change their age range. Two other lower schools, Robert Peel Lower and St. Swithun's VC Lower, are required to expand their accommodation from September 2018 for year 6 children.

Education standards and diversity of provision

The new classroom and toilets will help provide the accommodation required for year 6 children to remain at John Donne C of E VA Lower School, which is an Ofsted ‘Good’ school. The governing body believes that the change from lower to primary will provide stability and a continuity of learning, and reflect the changing face of schooling in Sandy, the surrounding rural areas and the immediate locality.

Although a number of schools within the Sandy area have determined to change their age range, there are a number of schools that are retaining their current age range; this allows parents to make a choice regarding the learning pathway for their child.

School size

The change of age range from lower to primary will increase the capacity of John Donne C of E VA Lower School from 120 to 168. The new build will help the school to accommodate the additional children from September 2018.

Proposed admission arrangements

John Donne C of E VA Lower School has a published admission number of 24 and even though a change of age range has been determined there are no plans to change this or the admission arrangements for 2017/18. Pupils would have the opportunity to continue into year 5 and year 6 or transfer to middle schools. The admission arrangements are published on the school’s website and include the criteria that will be used to determine how places are allocated if there are more applications for places than the number of places available.

National curriculum

John Donne C of E VA Lower School follows and will continue to follow the National Curriculum 2014 for Key Stage 1 and Key Stage 2.

Equal opportunity issues

The governing body of John Donne C of E VA Lower School will continue to meet their proactive public sector equality duty (PSED) which requires them to have due regard to the need to eliminate discrimination, advance equality of opportunity and foster good relations.

The proposed expansion would have no affect on any sex, race or disability discrimination issues. The school would continue to be committed to providing their pupils access to a range of opportunities which reflect the ethnic and cultural mix of the area, ensuring that all such opportunities are open to all.

Community cohesion

John Donne C of E VA Lower School is predominantly white British and therefore ensures that there is a multi-cultural element running throughout the curriculum to provide the children with the opportunity to learn about children from different backgrounds. An understanding of, and respect for, different cultures, faiths and communities is encouraged through both teaching and class trips.

Travel and accessibility

John Donne C of E VA Lower School will be encouraged to revisit the school’s travel plan in order to develop minimise the effect an increased number of pupils will have upon parking etc. within the local area.

School premises and playing fields

The new classroom and toilets are not to be built on the school’s playing fields. The school has sufficient playing fields and outside space and also has access to the playing fields within the village of Blunham.

Proposed stages for implementation

The new classroom and toilets are needed for September 2018 when year 5 children move up and become year 6.